Chronic Logic

Bridge It => Solutions => Topic started by: saadislam on March 16, 2009, 02:53:58 PM

Title: Need help with complex 1
Post by: saadislam on March 16, 2009, 02:53:58 PM
I m stuck on complex 1 for too long now and hv tried everything which came to mind.... Can anyone help?????
Title: Re: Need help with complex 1
Post by: Chronic Logic - Josiah on March 16, 2009, 04:59:33 PM
You need to run the suspension cable under the bridge with out much slack to keep it short and the cost low.  Then build off the cable with iron up to the deck.
Title: Re: Need help with complex 1
Post by: saadislam on March 19, 2009, 09:04:53 PM
thanx a lot...

got through complex 2 also... m on complex 3 now but it also sounds trickey... trying though...
Title: Re: Need help with complex 1
Post by: Ci2e on May 15, 2009, 08:56:58 PM
Can you post a picture of what your Complex 1 looks like - just curious if it looks anything like mine...

(http://farm3.static.flickr.com/2429/3534599616_a94aa017cb.jpg) (http://farm3.static.flickr.com/2429/3534599616_1ab6665fe0_o.jpg)

I'm not sure why that works but I have suspension cable connecting the deck to the suspension cable suspended below  :D
Title: Re: Need help with complex 1
Post by: jpaiva2000 on June 15, 2009, 08:50:34 PM
lol, that is impossible on Bridge Construction Set. Major bug :)