Author Topic: Normal #16  (Read 2388 times)

harlaken

  • Newbie
  • *
  • Posts: 3
    • View Profile
Normal #16
« on: December 19, 2001, 08:05:58 PM »
I was finally able to build a large arch bridge with cable rigging that would put a square-rigger to shame that would span the 400 meters or so necessary to see the fireworks but I'm not really satisfied with having to go that route to finish a normal level.  Has anyone completed that one without using complex mode and without breaks?

Calis

  • Jr. Member
  • **
  • Posts: 47
    • View Profile
Normal #16
« Reply #1 on: February 23, 2002, 05:28:28 AM »
Hmm.. first working clean bridge here for 150k (on hard):
a heavy steel tower on both sides (2 units high), flat deck (non complex) and cables all over :)

Gray

  • Sr. Member
  • ****
  • Posts: 293
    • View Profile
    • http://www.bridgebuilder-game.com
Normal #16
« Reply #2 on: December 20, 2001, 01:43:38 PM »
I think my first solution was a light-steel-only simple-mode arch without breaks, not very cost-effective though...
http://www.bridgebuilder-game.com
Shut up, Brain, or I'll stab you with a Q-tip! -- Homer Simpson