Zatikon is back and free to play! https://www.chroniclogic.com/zatikon.htm
This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.
Show posts MenuI just threw together a contest bridge in 5 minutes for kicks, it actually held, and it cut off a huge amount from the bridge I submitted. The winning bridge had BETTER be cheaper or I'm gonna smack myself.:shocked:
(Edited by Sarterixa at 1:19 am on Oct. 20, 2001)
On a totally different subject: I started the longest thread, yay!
Working on a bridge for hours to reduce the cost by a few thousand dollars is kinda a pain, plus everybody builds bridges differently and you could be on the wrong track when revising your bridge.
I tend to lay the floor first thing, test it for kicks, then I slowly add supports and see what snaps first.
I'm stumped. I can make a bridge that holds but the train stalls and stops just short of the top (halfway up the last platform). How did other people do this?